Colony Repair Rhythms

14-week cycles, same as tuning a saxophone or planing a board. Mars crews will need steady hands like Roseville seniors fixing drawers before any dome goes up.

The Groove

Week 1-2: Inspect like pre-flight checks. Week 3-4: Patch small leaks before they flood the joint. Repeat with gospel hymns on the radio.

Back to workshop